Construction Change Order Template

A formal change order document, generated by AI from a short description of what's changing on the job — not a fill-in-the-blank form. FLYNT Docs writes a real formatted draft describing the requested change, its impact on cost and schedule, and a client approval section, which you then edit with the job's real numbers.

The exact prompt FLYNT uses

“Create a formal change order document for a construction project, describing the requested change, its impact on cost and schedule, and requiring client approval.”

AI-generated documents vary a little each time — this is the real instruction, not a fixed sample output.

Who it's for

General contractors and remodelers who need to document a scope change formally, in writing, before doing the work — so there's a signed record if cost or timeline gets disputed later.

Key features

  • Generates a complete, formal change order from one plain-language description of the change
  • Covers what a real change order needs: the requested change, cost impact, schedule impact, and client approval
  • A real starting draft to edit with the job's actual numbers, not a fixed template you fill in around the edges
  • Exports to a real .docx file

How to use it

  1. Click "Use this template" to open FLYNT Docs with this prompt loaded
  2. Describe the specific change — what's different from the original scope, and why
  3. Click Generate and review the draft
  4. Add the real cost and schedule impact, and the client's name
  5. Export as .docx and get it signed before proceeding with the changed work

What's included

  • The exact AI prompt used to generate the change order (shown below)
  • A structure covering the requested change, cost impact, schedule impact, and approval

Common use cases

  • Documenting a client-requested upgrade mid-project
  • Recording an unforeseen condition (e.g. structural issue found after demo) that changes cost or timeline
  • Getting written, signed approval before extra work proceeds, to avoid a later dispute over what was agreed

Frequently asked questions

Is this a legally binding contract?
It's a real draft of a standard change order document, not legal advice. Whether it's binding depends on your original contract's terms and how it's executed (e.g. both parties signing) — many contractors have a lawyer review their change order language once, then reuse that structure.
Will I get the exact same draft every time?
No — AI generation varies a little each time, the same way asking a person to draft something twice produces two different drafts. The structure stays consistent; the exact wording won't be identical.
Is this free to use?
Yes — AI document generation is included in FLYNT's free plan, no credit card required.